

Heavy Equipment Track Assembly Cleaning
- Asset
- Case backhoe loader with heavy caked mud and grease across tracks, hydraulics, and undercarriage
- Challenge
- Layered mud and grease across the undercarriage was obscuring inspection points, pins, and hose routing — making service and safety checks difficult.
- Solution
- Pre-treated with dedicated degreaser, allowed proper dwell time, then targeted rinse at 4 GPM / 4,000 PSI, working top-down across the machine.
- Result
- Undercarriage, hoses, and inspection points fully exposed. Machine returned to service ready for a clean visual and mechanical inspection.



